RESEARCH ARTICLE


Waste Management of Emergency Construction Work. Case Study: 40 Dwellings in Seville (Spain)



Antonio Ferreira-Sánchez*, Madelyn Marrero
University School of Technical Arquitecture, Architectural Constructions II, University of Seville, Avda, Reina Mercedes, CP 41012, Seville, Spain


Article Metrics

CrossRef Citations:
4
Total Statistics:

Full-Text HTML Views: 3255
Abstract HTML Views: 1809
PDF Downloads: 781
ePub Downloads: 654
Total Views/Downloads: 6499
Unique Statistics:

Full-Text HTML Views: 1691
Abstract HTML Views: 960
PDF Downloads: 574
ePub Downloads: 449
Total Views/Downloads: 3674



Creative Commons License
© 2017 Ferreira-Sánchez and Marrero

open-access license: This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International Public License (CC-BY 4.0), a copy of which is available at: (https://creativecommons.org/licenses/by/4.0/legalcode). This license permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

* Address correspondence to this author at the Department of Building Constructions, University of Seville, Avenida de la Reina Mercedes 2, Seville, Spain, 41012; Tel: +34+954556661; Fax: +34+954556691; E-mail: ferreirasanchez@hotmail.com


Abstract

Eco-efficient rehabilitation of buildings and neighbourhoods should include strategies to reduce the potential environmental impact of buildings under consideration for demolishment. In this case, good construction and demolition (C&D) waste management can represent a doubly eco-efficient approach: advantage is taken of much of the building and the volume of waste is reduced during construction and demolition work.

Construction and demolition waste management in emergency situations is a subject yet to be studied in the construction sector. This kind of work, although not very common, involves major building damages and the need for punctual, partial or total demolitions. The amount of C&D waste can be a major problem to deal with, and its management during the critical first phases can determinate the progress of the rehabilitation.

Conditioned by a greater number of factors than normal construction works, the lack of time for the identification, quantification, and evaluation of C&D waste renders this type of extremely useful study.

In this work, from the case study of the emergency repair of a residential building of 40 dwellings in Seville (Spain) seriously affected by a soil displacement, Generated C&D waste are identified and the waste reduction techniques used are shown. These techniques contributed to achieve the planned objectives and to control in advance the cost.

Finally, the most important data, C&D waste quantification and the managing cost are presented in order to serve as reference for similar circumstances in the future because there areno clear references to be used.

Keywords: Construction, Demolition, Emergency, Management, Quantification, Waste.