Before | After | |
---|---|---|
Functionality Existing flats Terrace |
Four homes in a state of deterioration with deficiencies Out of use, obsolete installations, high side walls |
All homes refurbished and in use New penthouses, green roof, reduced side walls |
Accessibility Vertical mobility Communication |
The stairway was the only method to ascend (5 floors) Telecommunication installation with deficiencies |
Renovated stairway and incorporation of elevator New intercom system and telecommunication installation |
Safety Structures Installation |
Slabs between floors with affected materials Residual water pipes with cracks and leaks |
Repair and reinforcement of slab and load-bearing walls Replacement of pipes and new connections |
Heritage Main façade Interior spaces |
Deteriorated, discolored or missing closures, Walls, ceilings and carpentry in poor condition or modified from original |
Refurbishment of walls, carpentry and decorative elements Restoration of walls and woodwork to their original state |
Sustainability Existing building New penthouses |
Skin without insulation, inefficient installations, lack of comfort - |
Insulation in façades, efficient climate control, better waterproofing Thermal quality superior to standard regulation in walls and woodwork |
Economy Current expenses Revaluation |
High, but insufficient to maintain and refurbish the building - |
Minor given the incorporation of new neighbors in flats and penthouses Estimation: 35% for a sale; 70% for rental |