Table 9: Identified Issues in the Portable System Operation.

Steps Identified Issues
Transport to the central mixer. Bagged material loss.
Bagged material not picked-up after the end of the service in the pavement.
Conditioning close to the central mixer. Using the bagged material in other services.
Mortar mixture. Final mixing consistency unsuitable for projection.
Produced volume higher than demand.
Mortar application. Clogging (hose).
Deregulated output pressure (possibility).

Source: Elaborated by the authors.