Table 5: Economic comparison of BSM and CSM method.

Total Cost ($)
(Per Unit Length)
Cost Per Unit Volume
($)
Volume (Per Unit Length) m2 Method
480.36 1 480.36 BSM
2880 4.8 600 CSM