| ITEM | DESCRIPTION | ECONOMIC INDICES |
|---|---|---|
| DESIGN | Technical Office; Details “Engineerization”; Calculations Executive design; Design checks |
16 €/t |
| DRAWINGS | Static elements approval drawings | 60 €/t |
| MATERIALS | Steel (beams, columns and plates); Concrete | 1080 €/t |
| PRODUCTION | Pre-manufacturing within the factory | 450 €/t |
| QUALITY CONTROLS | Performed within the factory | 54 €/t |
| TRANSPORTATION | Supposed a range of transportation of 500 km; Means of transportations | 40 €/t |
| INSTALLATION | Necessary equipment; Laying; Need of high altitude works | 370 €/t |
| BOLTS | Supposed hot zinc-coated | 80 €/t |
| Frame reference | 2150 €/t | |