Table 7: Floor displacements of the 7-story frame structure when the amount of explosion charge is 300 kg.

Floors 200 m 300 m 400 m
Floor displacement
(m)
Story drift
(m)
Floor displacement
(m)
Story drift
(m)
Floor displacement
(m)
Story drift
(m)
1   1.142E-02 1.142E-02 9.711E-03 9.711E-03 8.852E-04 8.852E-04
2   2.082E-02 9.400E-03 1.771E-02 7.999E-03 1.615E-03 7.298E-04
3 2.811E-02 7.290E-03 2.391E-02 6.200E-03 2.179E-03 5.640E-04
4 3.404E-02 5.930E-03 2.896E-02 5.050E-03 2.640E-03 4.610E-04
5 4.303E-02 8.990E-03 3.661E-02 7.650E-03 3.337E-03 6.970E-04
6 4.873E-02 5.700E-03 4.145E-02 4.840E-03 3.779E-03 4.420E-04
7 5.095E-02 2.220E-03 4.334E-02 1.890E-03 3.951E-03 1.720E-04