Table 7: Means and test values for “Factors related to the project”.

Factor Mean Std. Deviation %of Relative Importance Index t-value P-value Rank
Project size and business required. 4.17 0.711 83.37 15.507 0.000 1
Project Nature (Traditionnel-Récursive-Unique). 3.99 0.715 79.78 13.046 0.000 2
The cost of the project. 3.74 0.846 74.83 8.265 0.000 3
Type of project (new construction, restoration and maintenance). 3.69 0.684 73.71 9.451 0.000 4
Project Location (packed or serviced). 3.56 0.976 71.24 5.428 0.000 5
Total 3.83 0.498 76.58 15.716 0.000