Projects | Change Order | Projects | Change Order |
---|---|---|---|
1 | 1-Ordinary concrete for walks 2-Processing of materials and dye with a paint 3-Processing of materials and packaging with ceramic tiles for facades 4-Material processing and packaging of stone for the facades 5-Processing of materials and packaging of the floor and sides of the stairs mirrors 6-Processing of materials and work of secondary ceilings 7-Focus glaze with cement mortar 8-Processing materials and whitewash with plaster 10-Bentonite pigment 11-Concrete concretes for bridges 12-Reinforced concrete ceilings 13-Two opposite layers of Kair 14-The tiling of the cutter |
11 | 1-Fuzzy delete 2-Prose works Concrete works 3-Plastic pipe fitting |
2 | 1-Prepare the material and do the cleaning of the site, with skimming the upper soil and moving it to hallowed places 2-The processing of materials and the burial of successful mosaic under the floors 3-Ordinary concrete using floor-resistant cement 4-Ordinary concrete using cement resistant to walkways 5-Concrete concretes for bridges of all floors 6-Reinforced concrete for interior and exterior stairs 7-Construction of the blocks above the exchange for all floors 8-Whiteness with plaster |
12 | 1-Vibrio cement 2-White plaster 3-Ceramic application |
3 | 1-Concrete for exchanges 2-Building blocks for partitions |
13 | 1-Liquor Cement 2-Outdoor cooking fumes 3-The tubs |
4 | 1-Material processing and faking work for facades and mold removal 2-Equipment processing and demolition of old buildings |
14 | 1-Fuzzy delete 2-Prose works Concrete works 3-Plastic pipe fitting |
5 | 1-Brush layer brushes 2-Aluminum Works 3-Florence Double F2 4-Go to the stairs of the Dosa stairs with a distance of 1.8 * 0.3 m 5-For the stairs of the stairs with a height of 1.8 * 0.17 m 6-Take a phone |
15 | 1-Taking capacity 13 2-The introduction of a copper cable 4 * 35 3-Works of Tulsa |
6 | 1-Liquor Cement 2-Arranging workshops and setting the floor under the floors |
16 | 1-Stone packaging 2-Processing of cameras |
7 | 1-The processing of successful burial materials under the floors 2-Secondary ceilings 3-Burial in clean soil 4-Ordinary Concrete Flooring 5-Liquor Cement 6-Exterior of the Alabaster 7-Applying to the Macchi delete |
17 | 1-Prepare the material and do the cleaning of the site, with skimming the upper soil and moving it to hallowed places 2-Arranging workshops and setting the floor under the floors 2-Concrete Flooring |
8 | 1-Processing materials and carrying out the installation of a 15 cm 2-Planning and drilling all kinds of foundations 3-Reinforced concrete ceilings |
18 | 1-Liquor Cement 2-Materials processing and dyeing of bennetlite |
9 | 1-Vibrio cement 2-White plaster 3-Ceramic application |
19 | 1-Vibrio cement 2-White plaster 3-Ceramic application |
10 | 1-Grounding the foundation aspects 2-Construction with solid floors under the paddle |
20 | 1-Grounding the foundation aspects 2-Construction with solid floors under the paddle |