Table 7: A reduced set of duration estimation accuracy factors.

Critical Duration Estimation Accuracy Factors
Project type (x1) Number of bridges (x27)
Project complexity (x2) Contractor's experience (x31)
Project area location (x3) ROW acquisition costs (x32)
Project size (x6) Weather condition (x35)
Site topography (x11) Soil type (x36)
Bridge type and complexity (x26) Total project cost (x43)