Target Utility Scheme | Minimum Distance (×2) |
Minimum Time (×3) | Transport Cost (×3) | Construction Cost (×1) | Reserve Number (×1) | Total Sum of Utility |
---|---|---|---|---|---|---|
P1 | 0.5/1 | 0.75/2.25 | 0.67/2 | 0.5/0.5 | 0.8/0.8 | 6.55 |
P2 | 0.3/0.6 | 0.5/1.5 | 0.5/1.5 | 0.2/0.2 | 0.5/0.5 | 4.3 |
P3 | 0.6/1.2 | 0.33/1 | 0.33/1 | 0.6/1.2 | 0.4/0.4 | 4.8 |