| Scheme | Switch operation | Evaluation indices | |||||
|---|---|---|---|---|---|---|---|
| on | off | The quantities of restored load | The margin of load capacity | Switching times of circuit breakers | Transferred load | Rate of load balancing | |
| 1 | D2 | C1 E3 | 230 | -5 | 3 | 180 | 2.542 |
| 2 | B2 D2 | C1 E3 | 150 | 60 | 4 | 100 | 2.000 |
| 3 | B3 | E3 C5 | 230 | 25 | 3 | 230 | 1.600 |
| 4 | B3 D3 | E3 G4 C5 | 230 | 30 | 5 | 230 | 1.800 |
| 5 | D2 D3 | C1 E3 G4 | 230 | 25 | 5 | 180 | 2.292 |
| 6 | B1 B2 | C1 D1 E3 | 230 | 40 | 5 | 180 | 2.000 |