Table 1: Anticipatory steps to minimize internal validity threats [40].

Weaknesses Things done to minimize weaknesses
History Agreement with the hospital management that there was no other treatment between pre and post test.
Maturation The time gap between pre and post was only two months.
Testing Measurement of dependent variables was carried out by the observer instead of the self report.
Instrumentation Pre- test and post- test observations were carried out by different rater