Equipment | Power consumed or delivered |
---|---|
Pitting machine | W= 12.50 kW |
Belt conveying (P-1/BC) | W= 9.07 kW |
Grinding (P-4/GR) | W=90.71 kW |
Agitation (P-5/Extract) Rme =90% | W=11.07 kW |
Centrifugation (P-6) | W= 29.9 kW |
Fermentor (P-9 /Ferment) Agitation Rme =90% Cooling |
W=1.2 kW Q =11.96 kW (-) |
Pumps: (P-10/PM-1) Rme=70% (P-10/PM-2) Rme=70% (P-10/PM-3) Rme=70% |
W=0.03 kW W=0.03 kW W= 2.80 W |
Evaporator (P-11/HXF) Rth =90% | Q=63.63 Kw |
Condensation (P-12/HX-2) Rth =90% |
Q=3.38 kW (-) |
Distillation (dist-1) Condenser Boiler |
Qc=1058.22 kW (-) Qb=1094.59 kW |
Distillation (dist-2) Condenser Boiler |
Qc=119.9 kW (-) Qb=120.78 kW |
Distillation (dist-3) Condenser Boiler |
Qc=226.07 kW (-) Qb=249.3 kW |